Company Startup
Deha Tech has founded by two close friends Mr. Berk Dal and Mr. Hakan Yıldırım. The Company motto ''Genius Solutions'' is to meet tomorrow's market from now on with tailored solutions.
2009Company Startup
Our First HEPP and Factory Construction
Deha Tech's first Garzan Hydroelectric Power Plant and Areva Transformer Factory Construction projects has been successfully delivered to its clients as Turnkey Projects.
2010 - 2011Our First HEPP and Factory Construction
Deha Tech Fabricated Flue-Gas Desulfurization (FGD) in Cyprus Power Plant
Flue-Gas Desulfurization (FGD), De-Sox Tower & Pump station, 13.5 m3 / 12 Bar steam drum Energy Power Plant fabricated and installed in Cyprus.
2011 - 2012Deha Tech Fabricated Flue-Gas Desulfurization (FGD) in Cyprus Power Plant
Nainawa is the fourth biggest power plant in Iraq. The tank farms fabricated and installed by Deha Tech
Deha Tech is main EPC contractor of 750 MW Nainawa Power Plant project. This project is designed to operate with three different fuels (crude oil, natural gas and diesel fuel), and crude oil is used as the primary fuel. Deha Tech fabricated and installed 16 Nos Fuel Storage Tanks and Erection works of Fire Fighting System of the project site including piping, hydrants and valves, erection works of Fire Fighting Pump House
2011 - 2013Nainawa is the fourth biggest power plant in Iraq. The tank farms fabricated and installed by Deha Tech
Increasing our experience of EPC in CCPP Project
Our experience of EPC projects increasing with 900 MW Erzin CCPP Plant Project. Turnkey Project for Engineering, Fabrication, Erection and API6650 Tank Inner Piping works of 7 units of field erected Storage Tanks
2012 - 2013Increasing our experience of EPC in CCPP Project
ACC Structural Steel for Energy from Waste Plant in Plymouth, Hagen and Bamberg
Deha Tech fabricated a good solution for Plymouth, MVV Environment c/o Devon Port EfW CHP Facility Devon, MVA Hagen EfW 17 MWe and MHKW Bamberg EfW 11,3 MWe in ACC Structural Steel.
2013 - 2014ACC Structural Steel for Energy from Waste Plant in Plymouth, Hagen and Bamberg
Fabrication and Installation Filter Conversion for Cement Factory & Wind Measurement Masts
Deha Tech's Fabrication and Installation Filter Conversion Cement Factory and Wind Measurement Masts Projects completed successfully.
2013 - 2015Fabrication and Installation Filter Conversion for Cement Factory & Wind Measurement Masts
One of our important goal is to provide our clients with a smart Ammonium Nitrate Plant.
Flue-Gas Desulfurization (FGD), De-Sox Tower & Pump station, 13.5 m3 / 12 Bar steam drum Energy Power Plant fabricated and installed in Cyprus.
2014 - 2015One of our important goal is to provide our clients with a smart Ammonium Nitrate Plant.
Khabat Thermal Power Plant fabrication and Hamitabat field erected tank for 1200MW natural gas CCPP
Khabat 300 MW Thermal P. Plant fabrication successfully completed. Hamitabat fielderected tank for 1200mw natural gas combined cycle power plant with all detail design, construction works, procurement and installation of the main and auxiliary equipment of the power plant have been completed. A new power plant with a capacity of 300 megawatts (MW) in Iraq's.
2016 - 2017Khabat Thermal Power Plant fabrication and Hamitabat field erected tank for 1200MW natural gas CCPP
Our vision growing into preferred energy company in target countries
Combined cycle power plant projects has begun its operations. Deha Tech erected storage tanks in 2017, Mary 3 and Turakurgan combined cycle power plant projects in Uzbekistan and Turkmenistan.
2017 - 2018Our vision growing into preferred energy company in target countries
Turning municipal waste into usable energy, Turkey's first EfW plant will also be the largest in Europe
Deha Tech manufactured and delivered main components-feed hopper, bottom ash chute, boiler non-pressure parts, grate riddlings and silos- not only for Europe’s largest EfW plant in Istanbul also EfW in France, UK, Germany & Austria.
2018-2019Turning municipal waste into usable energy, Turkey's first EfW plant will also be the largest in Europe
Waelz facility for processing of zinc materials carried out by our professional engineers and technicians has been completed.
Deha Tech has completed the installation and commissioning services of a Rotary Kiln as a EPC Project. The extractive metallurgy process has been designed according to the raw material stored.
2019 - 2020Waelz facility for processing of zinc materials carried out by our professional engineers and technicians has been completed.
In order to build a better future, we transformed our past experiences into worldwide services in 2021
Deha Tech continues to provide the highest quality services worldwide at full speed, with a total of 2000 employees, 4 factories and 1 port in a 59000 sqm production area. Since our inception, we continue to serve with 4 offices in Turkey, Iraq, Uzbekistan and Bulgaria.
2021In order to build a better future, we transformed our past experiences into worldwide services in 2021
Deha Tech has achieved success in the cement industry in Uzbekistan
Deha Tech has been succesfully completed the construction, installation and commissioning services of Tashkent 100 TPH Grinding Station as well as Navoi 5500 TPD Clinker Production Line as EPC Project in 2022.
2022